| Does the city fuss tire you?
You dream of a rest...fresh air of a pine wood?
Your dream is to wake up under singing of birds in the morning? - 3 twin houses in Imanta - Your choice!
The project IMANTAS NAMI - three
three-tier houses-doubles Houses situates on well developed territories
in the center of Imanta district, near to the Anniņmuizas park. The
exclusive location of houses gives all advantages of a country house in
one of the most prestigious microdistricts of Riga with the developed
infrastructure. In some minutes of walking from your future house there
are some shopping centers, fitness club, schools, kindergartens, the
house of culture and a buss stop and at all this riches of city
convenience, large windows of your bedroom goes on a pine forest!
Houses were completed in March 2008 .
1. Each house has:
• all in and out walls of a building fully erected according to the project. • the facades, habitable and unhabitable roomsare finished. • there are internal partitions in the house, according to the project (material Fibo blocks 300mm.) • there is a noise isolation on the general wall. • all plaster works on the walls are performed (under final finishing). • ceiling and floor are prepared for final finishing. • overlaps and floors – monolith. • facade is warmed by mineral cotton Parok 100 mm. • premises of all floors are fully finished with a lining of all engineering networks and heating systems, including gas boilers and radiators. • the handrails and metal structures are established, the glass according to the project (the handrail is made of a stainless steel). • the systems of a water-drain and drain canalization from the roofs are established. • the garage gates with automatics (on a price category above an average) are established. • the socle tile is established. • electricity is executed by a power cable of the 5th category and installed according to the separate project “ Smart House ”, and a cable for acoustic systems and a house cinema is established all over the house, according to aforementioned project. • the electricity counters are established. • the ventilation and smoke removal system is established. • the fire water pipe is fully executed, and the water pipes of cold and hot water are led to the intraroom counters and to the points of supply – instruments. • all sewerage posts with distributing on an apartment are established. • the inputs of satellite TV are established and connected up to distributive boxes. • the cabels for an opportunity toconnect he Internet are laid. • the internal and external main engineering networks are established.
|